The key facts
- The second vertiport, Dubai Marina (call sign VMR), has been certified by the UAE General Civil Aviation Authority; the route will link it to the VDX terminal near Dubai airport
- The Joby electric aircraft flight will take under 10 minutes versus 35 minutes by road; the vertiport is designed for up to 21,000 landings and 84,000 passengers per year
- Two more vertiports are under construction in Downtown Dubai and on Palm Jumeirah; commercial services await operational approvals
Second vertiport ready: Dubai — Marina route certified
Dubai has completed construction and certification of its second vertiport — Dubai Marina, developed by Skyports Infrastructure and certified by the UAE General Civil Aviation Authority. The facility received the aviation call sign VMR and, together with the main VDX vertiport near Dubai International Airport, forms the world's first permanent electric air taxi line between two purpose-built sites. The network will be operated by California-based Joby Aviation.
What the Dubai Marina terminal looks like
The vertiport is located next to the American University in Dubai, within walking distance of the Al Fardan Exchange metro station, which connects it to the city's transport network. One elevated takeoff and landing pad, a passenger terminal and a charging station are designed for up to 21,000 landings and 84,000 passengers per year. The design draws on experience from marine aviation infrastructure, including an area where the eVTOL can charge without occupying the landing pad.
The flight is three and a half times faster than driving
Joby's electric aircraft reaches speeds of up to 322 km/h with zero operational emissions; the flight along the route should take less than 10 minutes compared with roughly 35 minutes by car. The company has been conducting piloted test flights in Dubai since June 2025, and in November 2025 it performed the UAE's first point-to-point air taxi flight — from the test site in Margham to Al Maktoum International Airport.
What project participants said and what remains uncertain
Joby Aviation's General Manager for the UAE, Anthony El-Khoury, called the project a new way of moving around the city: a trip to or from the airport, in his words, will become part of the experience rather than time spent in traffic, with Downtown and Palm Jumeirah still ahead. Ahmed Bahrozyan, head of the Committee for Autonomous Transport and Air Taxis, called the completion of construction a significant milestone on the path to smart and sustainable mobility that complements existing public transport. At the same time, the start of commercial flights still depends on obtaining the relevant operational approvals; no launch timeline was given in the publication. Two more vertiports — in Downtown Dubai and on Palm Jumeirah — are under construction.


